Special Case
Experience is always special case.
Events: Energy events and structures are always special case
The human brain apprehends and stores each sense-reported bit of information regarding each special-case experience. Only special-case experiences are recallable from the memory bank.
Apprehends: To become conscious of, as through the emotions or senses; perceive
There is in Universe a vast order. It never forsakes. I throw a coin in the air, and it returns and hits the floor every time.
Nature is never at a loss about what to do about anything. Nature never vacillates in her decisions.
The rolling oceans cover three- quarters of Earth. Along the beaches, the surf is continually pounding on the shore. No two successive local surf poundings have ever been the same nor will they ever be the same. They typify the infinitude of individualism of every special-case event in the Universe.
Forsakes: To leave altogether abandon
Vacillates: To swing indecisively from one course of action or opinion to another
Infinitude: The state or quality of being infinite
Weightless, abstract human mind reviews and from time to time discovers mathematically reliable and abstractly statable interrelationships existing between and amongst, but not “in” or “of,” any of the special-case experience components of the relationship.
When a long-term record of testing proves the relationship to persist without exception, it is rated as a scientifically generalized principle. Whenever human mind discovers a generalized principle to exist amongst the special-case experience sets, the discovery event itself becomes a new special-case experience to be stored in the brain bank and recalled when appropriate. Amongst a plurality of brain-stored, newly understood experiences, mind has, from time to time, discovered greater and more significant understandings, which in their turn as discoveries, which are “experiences, constitute further very special-case experiences to be stored in the recallable and re-considerable brain bank’s wealth of special-case experiences.
Tags: aggregate, brain, bucky fuller, critical path, experience, generalized principle, metaphysical, mind, special case, storage retrieval, The Bucky Call
Subscribe via email or RSS